Refine Search

  •  
  •  
Soldotna under construction

...Soldotna Creek Park is almost complete. The kiosks for information boards are being installed as well as fascia on steel structures. Growing grass on open areas is yet to be finished and the opening of these areas to foot traffic will be at the...

http://peninsulaclarion.com/news/2014-05-28/soldotna-under-construction
News
Great Alaska Quake shook up science

...in Anchorage, said the modern idea behind designing large commercial buildings is much the same.Fierro said steel structures are designed so the lateral beams act as a "seismic fuse" and spare the columns - designed heavier for two to three...

http://peninsulaclarion.com/news/2014-03-22/great-alaska-quake-shook-up-science
News
Refuge Notebook: New Visitor Center Becoming Reality

...the concrete walls will disappear below grade, covered by landscaping once the foundation work is complete. The steel structure rising above the walls is the underpinning for a green roof, sown with grasses that will further dissolve the line...

http://peninsulaclarion.com/outdoors/2014-03-13/refuge-notebook-new-visitor-cent
Outdoors
Kulluk in stable condition

...Kodiak.Openings on the main deck of the drill barge, including windows and hatches, have been secured. Temporary steel structures have been added to some so that they will remain water-tight "for potential tow operations."Naval architects...

http://peninsulaclarion.com/news/2013-01-30/kulluk-in-stable-condition
News
New store takes shape

...easier time conceptualizing what the long anticipated giant retail facility is going to look like when done. "The steel structure is up pretty much," said Mark Pollock, Roger Hickel Contracting site supervisor, adding that the company "hopefully...

http://www.peninsulaclarion.com/stories/061109/new_351049782.shtml
Unocal begins gas exploration on the Southern Kenai Peninsula...

...from the road and residents in the near vicinity may hear operations. After the wells are completed only a small steel structure will remain that will not be visible unless you drive on to the location.

http://www.peninsulaclarion.com/stories/110601/dis_110601dis0040001.shtml
dispatch
Municipal structures take a hit

...All of the boardwalk down from the Soldotna Visitors Center was damaged and has been replaced with a newer design steel structure. Twenty-five sets of stairs were damaged at Centennial Park and all but one have been repaired or replaced. ?We lost...

http://www.peninsulaclarion.com/stories/062807/news_0628new001.shtml
News
Steel structure framework for 30 x 40 building, $13,000.00. (907) ...

Steel structure framework for 30 x 40 building, $13,000.00. (907) 226-2145

http://secure.adpay.com/clicknbuy.aspx?p=2062&adid=PCK11170029
1

CONTACT US

  • 150 Trading Bay Rd, Kenai, AK 99611
  • Switchboard: 907-283-7551
  • Circulation and Delivery: 907-283-3584
  • Newsroom Fax: 907-283-3299
  • Business Fax: 907-283-3299
  • Accounts Receivable: 907-335-1257
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING

MORRIS ALASKA NEWS