Refine Search

  •  
  •  
Director of Access Network Development - Network Technology Mana Job in Elmendorf Afb 99506, Alaska

...Visio, SAP, Office, and AutoCAD. Other Requirements Experience with right of way and easement negotiations, power systems understanding, knowledge of infrastructure and building designs. Must be authorized to work in the United States...

http://jobview.local-jobs.monster.com/Director-of-Access-Network-Development-Net
Director of Access Network Development - Network Technology Mana Job in Elmendorf Afb 99506, Alaska

...Visio, SAP, Office, and AutoCAD. Other Requirements Experience with right of way and easement negotiations, power systems understanding, knowledge of infrastructure and building designs. Must be authorized to work in the United States...

http://jobview.local-jobs.monster.com/Director-of-Access-Network-Development-Net
RCA adopts net metering rules

...general, it means that homes or businesses which set up solar, wind-energy, small-scale hydro or other alternative power systems can send power back into the electric grid and receive credit at either a kilowatt-hour or dollar basis. Some net...

http://www.peninsulaclarion.com/stories/102209/new_507829105.shtml
Cemetery site possible: Committee may have final resting place for residents

...construction phase engineering services on two street improvement projects. A $138,000 contract was awarded to Electric Power Systems Inc. for renovation and upgrades of the water distribution Supervisory Control and Data Acquisition (SCADA) system...

http://www.peninsulaclarion.com/stories/033009/new_283048169.shtml
Despite crashes, Alaska aviation safer than ever

...that are often more in need of these cameras, installation can cost between $300,000 and $500,000 where remote power systems and all of the supporting infrastructure must be constructed. And another innovation Journeay listed was a changed...

http://www.peninsulaclarion.com/stories/083010/new_702163646.shtml
News
Company eyes Alaska's North Slope for Internet data storage center

...such enormous consumers of electricity, utility companies in the Lower 48 are worried about the increasing demand on power systems that are already at or nearing their capacity. Much of the energy consumed by data centers is needed to keep the buildings...

http://www.peninsulaclarion.com/stories/051401/ala_051301ala0050001.shtml
alaska
Ocean Renewable moves forward with tidal plans

...the letter says. The initial deployment phase, assuming everything came together, would mean that the initial power systems would be deployed in 2013. Then, in 2014 and 2015, Ocean Renewable would finish the complete pilot project. But...

http://www.peninsulaclarion.com/stories/051911/new_831831541.shtml
News
1

CONTACT US

  • 150 Trading Bay Rd, Kenai, AK 99611
  • Switchboard: 907-283-7551
  • Circulation and Delivery: 907-283-3584
  • Newsroom Fax: 907-283-3299
  • Business Fax: 907-283-3299
  • Accounts Receivable: 907-335-1257
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING

MORRIS ALASKA NEWS