Refine Search

  •  
  •  
Sterling Highway improvements planned

...and in many places the road will be expanded to three or four lanes. Transportation Engineer Zaid Hussein, of engineering consultant DOWL, which designed the improvements, said that the passing lanes are intended to ease summer traffic that...

http://peninsulaclarion.com/news/2015-05-26/stirling-highway-improvements-planne
News
Hope erodes

...bank stabilization design alternatives, cost estimating, surveying and mapping, which would be carried out by engineering consultant Tetra Tech Inc. The Corps is performing economic analyses, environmental evaluations, plan formulation and...

http://www.peninsulaclarion.com/stories/121707/news_3832.shtml
News
Borough asks for $125,000 to study Nikiski beach public access issues

...identified borough parcels that may be suitable for public beach access, and wants a review of the locations by an engineering consultant. "This project is intended to address concerns of several Nikiski residents, as well as Rep. Mike Chenault...

http://www.peninsulaclarion.com/stories/070408/new_257592672.shtml
Council works on to do list

...an ongoing water well project account. According to the latest cost estimate supplied to the council by the engineering consultant, Wince-Corthell-Bryson, there are inadequate funds appropriated to complete the anticipated Well C-2...

http://www.peninsulaclarion.com/stories/062708/new_255376731.shtml
1

CONTACT US

  • 150 Trading Bay Rd, Kenai, AK 99611
  • Switchboard: 907-283-7551
  • Circulation and Delivery: 907-283-3584
  • Newsroom Fax: 907-283-3299
  • Business Fax: 907-283-3299
  • Accounts Receivable: 907-335-1257
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING

MORRIS ALASKA NEWS